Pillor Water Supply Stopped
In view of maintenance works to be carried out in the 1,500 mm diameter main pipeline of the Pilloor Water Supply scheme, water supply will be stopped on July 8. After completing the maintenance works, water supply will resume on July 9. Local bodies and people should make arrangements for meeting the drinking water needs, a release from the Executive Engineer of Tamil Nadu Water Supply and Drainage Board here has said.